WQ Design StudioDiscuss a Project

PS-05 / Naval architecture

CTV-30 Crew Transfer Vessel

A compact crew transfer vessel developed for offshore wind farm operations through vessel configuration, hull development and hydrodynamic review.

CTV-30 Crew Transfer VesselWQ / PS-05 / Naval architecture

Engineering challenge

The vessel required a compact arrangement that balanced crew transfer, passenger capacity and offshore operating requirements.

Outcome

The study connected the vessel arrangement with CFD evidence on wake formation, pressure distribution and flow around the superstructure.

CTV-30 Crew Transfer Vessel project overview

Technical route

How the work progressed.

The sequence connects the technical basis to a reviewed engineering output.

  1. 01

    Establish the design basis

  2. 02

    Develop the vessel configuration

  3. 03

    Create the general arrangement

  4. 04

    Review wake and hull pressure

  5. 05

    Assess external flow

CTV-30 Crew Transfer Vessel engineering evidence

Project facts

Length overall26 m

Passenger capacity24

Target top speed36 kn

Deliverables

Vessel configurationGeneral arrangementHull planWake reviewPressure review

Start a project

Discuss a similar engineering challenge.

Share the available references and the outcome you need. We will help define the engineering route.

Discuss Your Project